Construction Case Studies
Home » Case Studies » ConstructionProjectEdmonton Sky View Mall ; 13304 137 Ave NW
PROBLEM
Sky View Mall, their front facade illuminated and have better appeal to clientele.
Goals
Design facade, that was weather resilient, housed a new style of lights. Incorporated blue acrylic, utilizing a stainless steel finish that accentuated the building landscape with low maintenance.
Approach
Worked with Lumican to design the light housings that were mounted to the front of Skyview C. Lumican performed the installation, TitanID fabricated the light housings, out of Stainless Steel, as per the clients recommendations to have a Blue Spear mounted down the center of the housing, and blue light box at the bottom of the housing, to hide the lighting enclosure.
Software Used: Solid Works
Hardware Used: Trumpf laser, Trumpf Press Break
Finishing: Cloth to remove any fingers prints after installation
Solution
Refer to supplied pictures.
RESULTS
Refer to supplied pictures.
ProjectAnodized Aluminum Parts
PROBLEM
Construction Tools.
GOALS
I developed precision anodized aluminum components enhanced with permanent fiber-laser etched markings, delivering a clean, high-contrast finish built for industrial durability and traceability. By combining optimized anodizing with crisp, non-contact fiber laser engraving, the parts achieve long-lasting identification that won’t fade, wear, or compromise surface integrity. The result is a professional-grade component solution that elevates both performance and visual impact—where function meets precision manufacturing excellence.
Approach
Software Used: Solid Works, PhotoShop
Hardware Used: TRUMPF Laser, TRUMPF Break, OMTECH Fiber Laser
Finishing Used: Anodized
Solution
Refer to supplied pictures.
Results
Refer to supplied pictures.
ProjectREVIVEWOOD - RECYCLED TELEPHONE POLE TIMBER FRAME
PROBLEM
Repurposing used telephone poles for another purpose.
GOALS
We were able to create a process and design that used the HEART of existing telephones, to create a Timberframe structure in a retired church. This project was able to bring the community together, and see the beauty and history of a retired church with past stories.
Approach
Software Used: Solid Works, and Sketch were used to design and build the TimberFrames
Hardware Used: Wood Mill
Finishing Used: Finishing carpenter
Solution
Refer to supplied pictures.
Results
Refer to supplied pictures.
ProjectMTech Locks, and Door Hardware Product Line
PROBLEM
MTech, needed a solution to help manage their multi diverse product line. When retrofitting Hotels / Motels, Office builds and towers. Doors, and door hardware come in varying shapes and sizes, when needed to mount and their key kard locks and systems within the buildings.
Goals
Titan has helped create a Catalogue Product line of: Strikes, Dress Plates, Door Wraps; and shrouds. They are a now able to manage and run JIT (Just -In -Time) principal for their inventory. We created tools, and standardized communication to help place orders, as well as, if any changes are required (on the fly), we can accommodate and provide them. To help manage the product line we created a number and naming convention to manage all the products. We also needed to establish material suppliers, for the fasteners, and raw material (Stainless Steel and Brass sheet).
Approach
Working with one of our fabrication partners, Software Used - Solid Works.
Hardware Usedd: Trumpf CNC laser, and Trumpf CNC Press Brake
Finishing Used: Stainless Steel Material shipped with PVC layer
Solution
Refer to supplied pictures.
RESULTS
Refer to supplied pictures.
ProjectSkillsCompetences Canada - Scaffolding Trades National Trophy
PROBLEM
SCC, is a nation wide competition, advances engagement of youth and their communities in skilled trade and technology careers using a pan-Canadian approach. Ultimately the competition goes Nation than World wide, finding the best Skilled Trades Person in the Country / World. Titan was sourced to design and build a Scaffolding National Trophy for Skills Canada. They wanted to use the Tripple Hitch Clamp as a symbol on top of the trophy.
Goals
The was to design, and convert the tripple hitch clamp into a 3D Model that could be 3D Printed. With a material finish that could have a chrome paint job. Needed a hardwood frame, that was Trophy and display quality.
Approach
Designed the proposal in Solid Works, and Solid Works Composer to build the proposal to submit to the client. I was able to utilize the 3D Model, and create a pamphlet explaining each key feature to the client, how it was to be fabricated, materials used and how it was going to be assembled prior to sign-off. To make the base, I worked with my partner Drawn2Wood, to choose the right wood "Mahagony" wood base, and he was able to orientate to showcase the wood grains, and plaques that were to be mounted to each face. Building the trophy top, needed to be designed for 3D Printing, and assembled with "no seams". With the trophy top, it needed to be built with a Chrome finish. At the time, there were no shops that could chrome plate plastic. Utilizing specific Air Brush techniques we were able to paint a Mirror Chrome finish on the parts.
Software Used: Solid Works, and Inventor
Hardware Used: Stratasys 3D Printer - SLA
Finishing Used: Light sanding, and airbrushing to simulate a Mirror Chrome finish (reflected fingers on the painted finish)
Solution
Refer to supplied pictures.
RESULTS
Refer to supplied pictures.





















